Most rear extensions in London are built without a planning application. They fall within permitted development: building work the government has already granted permission for, provided it stays inside fixed limits.
The limits are set out in the General Permitted Development Order, and they apply to houses, not flats or maisonettes. If you live in a flat, any extension needs planning permission. If you live in a house, the first question is how far the extension would project beyond the back of the original house — the house as it was first built, or as it stood on 1 July 1948 if it is older. Extensions added since then count against your allowance.
Single-storey extensions
A single-storey rear extension can usually project up to 3 metres beyond the original rear wall of a terraced or semi-detached house, or 4 metres on a detached house. It can be up to 4 metres high. If it comes within 2 metres of a boundary — as almost every extension on a terrace does — the eaves can be no higher than 3 metres.
Two further rules catch people out. Extensions and outbuildings together can’t cover more than half the garden and grounds around the original house. And the materials should look similar to the existing house, though a contemporary design in glass or timber is often acceptable for a rear extension that the street can’t see.
The larger-extension route
You can go further — up to 6 metres on a terraced or semi-detached house, 8 metres on a detached one — through what is called prior approval. It is still permitted development, but you must notify the council first. The council tells your adjoining neighbours, and if a neighbour objects it considers the effect on their light and outlook before deciding. The council has 42 days to decide, and you can’t start until it has.
Two-storey extensions
A two-storey rear extension can be permitted development too, but the limits are tighter: no more than 3 metres deep, at least 7 metres from the rear boundary, a roof pitch matching the house, and no upper-floor windows in the side walls unless they are obscure-glazed and fixed shut below 1.7 metres. On most London terraces, where gardens are short and neighbours close, a two-storey rear extension needs planning permission.
When the rights don’t apply
- Conservation areas. Single-storey rear extensions are still permitted, but anything of more than one storey is not.
- Article 4 directions. A council can withdraw specific rights in an area; check whether one covers yours.
- Listed buildings. Almost any change, an extension included, needs listed building consent.
- Earlier conditions. Some houses, often newer ones, had their permitted-development rights removed when they were built.
What permitted development doesn’t cover
Permitted development deals only with planning. An extension still needs Building Regulations approval, and if it is built on or near a shared boundary the Party Wall Act will usually require you to serve notice on your neighbours. A Lawful Development Certificate from the council, which costs a fraction of a planning application, confirms that what you propose is permitted — worth having when you come to sell.
Check your own address. HomeFinder, our free tool, looks up the planning registers, the decisions near you and a 3D model of your house for any London address. For your borough’s approval rates, see the borough guides.
This is general information about the rules in England, not advice on your project. Permitted development has conditions this page can’t cover in full; before you build, confirm with your council (a Lawful Development Certificate gives you certainty) or with an architect.
← All journal entries